BLOGGER TEMPLATES AND TWITTER BACKGROUNDS

Tuesday, March 10, 2009

Current Projects

I have six diapers cut out, serged, and with back elastic.

I still need to put leg elastic in (yuck), finish serging, make the snap in soakers (cut the zorb and hemp fleece), add snaps.

So, tonight I should do elastic and finish serging. Tomorrow, I can cut the zorb and hemp fleece. Sew the soakers up on Thursday/Friday and then add snaps when ever the snap elf is up to it. Brandon and I are discussing a trip to PA this weekend and if that's the case I need to have everything done by Friday.

I'm 10 weeks away from having Everett - it's game time.

I finished longies up for a tall thin baby, but haven't taken pictures of the final product. I'm pleased with them, but can't imagine such a tall baby! She has the same waist, rise, and hips as Benny but her inseam is 3-4 inches longer.

My next longies are a size small for a trade with Mollybolt (the lady who made the beautiful brown knit longies for Benny). Honestly, I feel so cool that she wants a pair of MY tunisian longies. I'll probably start those during one of Benny's naps while I watch Heroes or DWTS and then work on them after Benny goes to bed.

I haven't decided if I'm going to do my large pattern with a smaller hook OR figure out the size small with the H hook. Maybe I should do a practice pair...

0 comments: